Successfully carried out comprehensive Environmental and Social Impact Scoping Studies for Construtora Queiroz Galvão S. A., Succursal Gana for their bid for the Proposed Development (Augmentation, New Construction and Equipping) of High Voltage Sub-Stations and Extension of 132kv Transmission Lines to New and Existing Sub-Stations for Kenya Electricity Transmission Company Limited (KETRACO).
The ESIA scoping study reports covered the following projects:
- 60 Km Galu-Lunga Lunga Transmission line and Bay extension at Galu Sub-station.
- 165 km Isiolo – Maralal transmission line, Substation extension at Isiolo (with fibre cable termination and laying procedures) & new Maralal switchyard.
- 111 km Kabarnet-Nyahururu (Rumuruti) High Power Transmission line, a substation at Kabarnet & a Switchyard Extension (With Fiber).
- High voltage sub-stations at Karongo bay and Sindo, extension of substation at Homabay (Ndhiwa)
- Extension of 24 Km 132 Kv Ndhiwa Karungo bay and 48 km Ndhiwa Sindo transmission line.